INTEGRATED STEEL COMPLEX FOR JINDAL

Client:JSPL

Services:Basic Engineering

Year:2011

With the development rights for 20 billion tonnes of El Mutun Iron Ore Reserves in Bolivia, JSPL plans to invest in mining and setting up a 10 MTPA Iron Ore Pellet Plant, a 6 MTPA DRI Sponge Iron plant, an integrated 1.7 MTPA Steel Plant, a 1 MTPA Roll mill and 450 MW power plant .The 450 MW CCPP will produce power for the complex. Jindal has awarded Idom the basic and detail engineering of the complex.