COMBINED CYCLE POWER PLANT, 403 MW IN RUSSIA
Client: OGK-5
Services:Complete engineering
Year:2008 - 2011
COMBINED CYCLE POWER PLANT, 403 MW IN RUSSIA
Client: OGK-5
Services:Complete engineering
Year:2008 - 2011
The SUGRES complex located in Yekaterinburg provides heat to 40% of the population of the city through the distribution of hot water. SUGRES consists of three groups composed of a total of 11 turbines that generate a power of 1,100 MW. Idom participated in the construction of a fourth group, a 403 MW combined cycle and thermal generation of 200 Gcal/h, carrying out the complete combined cycle engineering.
Technical Area Director
Project Manager