En / Es


Client:Ministerio de Fomento

Services:Detailed Designs


Engineering design for part of the A-15, the Navarra Highway, with a length of 17.5 kilometres in the province of Soria. The route runs through a very environmentally sensitive area, so the exact fulfilment of the requirements specified in the Declaration of Environmental Impact was a priority of the project. It includes three junctions, a viaduct over the River Duero and cut-and-cover tunnel in the Peñablanca mountain.