IDOM

  • IDOM

    CONVERSION TO CCPP OF 3,700 MW, SAUDI ARABIA (PP10)

    CLIENT: BEMCO

    SERVICES: Basic and detailed engineering

    YEAR: 2011-2013

    COUNTRY: SAUDI ARABIA

    IDOM was contracted to perform part of the engineering for the conversion of the PP10 simple cycle with 40 simple cycle gas turbines, into a 10 combined cycle plant with a configuration of 4 gas turbines to 1 steam turbine.This requires the installation of 40 heat recovery steam generators (HRSGs),10 steam turbine generators and 10 air cooled condensers and other auxiliary equipment equipment (water treatment plant, compressed air…)