0 %

Sorry, there are currently no results available

Projects

News

Recent Publications

Vídeos

Offices

Geotechnical study of the ISFSI at Santa María de Garoña NPP

Spain

An Individual Spent Fuel Storage Installation (ISFSI) has been projected to store the spent fuel coming from the fuel storage pools of Santa María de Garoña Nuclear Power Plant after the saturation thereof. The scope of the geological and geotechnical works consisted in obtaining the necessary inputs for the design of the new installation. For this purpose, IDOM carried out the preliminary analysis of the geotechnical study concluding that an extension of the geotechnical study was suitable including a study of the transportation route of the spent fuel.

Energy

  • Share on Facebook
  • Share with Twitter
  • Share with Linkedin

CLIENT:
NUCLENOR

SCOPE:
Site Evaluation

  • IDOM_Nuclear_Services_ATI_Garo_a_NPP_Site_Evaluation