    750 MW Boufarik Simple Cycle Gas Turbine Fast Track Power Plant Project

    CLIENT: GAMA Power Systems Engineering and Contracting, INC. (EPC)

    SERVICES: Basic and Detail Engineering

    YEAR: 2013-2016

    COUNTRY: ALGERIA

    The plant is equipped with three GE 9FA simple cycle gas turbines, using natural gas as the main fuel and fuel oil as secondary fuel, with a total capacity of 750 MW. In September 2015, the first gas turbine, No. 3, was successfully commissioned.

    Energy - FOSSIL-FUEL POWER PLANTS - SIMPLE CYCLE GAS TURBINE