750 MW Boufarik Simple Cycle Gas Turbine Fast Track Power Plant Project
CLIENT: GAMA Power Systems Engineering and Contracting, INC. (EPC)
SERVICES: Basic and Detail Engineering
YEAR: 2013-2016
COUNTRY: ALGERIA
The plant is equipped with three GE 9FA simple cycle gas turbines, using natural gas as the main fuel and fuel oil as secondary fuel, with a total capacity of 750 MW. In September 2015, the first gas turbine, No. 3, was successfully commissioned.
Energy - FOSSIL-FUEL POWER PLANTS - SIMPLE CYCLE GAS TURBINE