IDOM

  • IDOM

    HIGH SPEED LINE MADRID-EXTREMADURA

    CLIENT: ADIF

    SERVICES: Detailed Design & Site Supervision

    YEAR: 2009 - ongoing

    COUNTRY: Spain

    The High Speed Line Madrid-Extremadura crosses over the Almonte River where it joins the reservoir, by means of an arch bridge spanning 384 m in total; making it the largest high-speed rail arch bridge in the world (by the length of the main span). This large arch makes up the main span over a 996 m long viaduct, with a clearance over the river of 80 m.

    More information.

    Pictures Copyriht@ UTE AVE ALCÁNTARA-GARROVILLAS (composed by FCC y CONDURIL)

    CONTACT

    Rail Director

    Enrique Rico

    eri@idom.com

    Infrastructure Managing Director

    Juan Ramón López Laborda

    jlopez@idom.com

    info.madrid@idom.com

    +34 91 444 11 50

    PUBLICATIONS

    URBAN LIGHT RAIL

    URBAN LIGHT RAIL

    IDOM Transport

    IDOM Transport

    BRAZIL HIGH SPEED

    BRAZIL HIGH SPEED

    Prespectivas de Crecimiento de la Movilidad Eléctrica

    Prespectivas de Crecimiento de la Movilidad Eléctrica