IDOM

  • IDOM

    HIGH SPEED LINE MADRID-EXTREMADURA

    CLIENT: ADIF

    SERVICES: Detailed Design & Site Supervision

    YEAR: 2009 - ongoing

    COUNTRY: Spain

    The High Speed Line Madrid-Extremadura crosses over the Almonte River where it joins the reservoir, by means of an arch bridge spanning 384 m in total; making it the largest high-speed rail arch bridge in the world (by the length of the main span). This large arch makes up the main span over a 996 m long viaduct, with a clearance over the river of 80 m.

    More information.

    Pictures Copyriht@ UTE AVE ALCÁNTARA-GARROVILLAS (composed by FCC y CONDURIL)

    CONTACT

    Rail Director

    Enrique Rico

    eri@idom.com

    Infrastructure Managing Director

    Juan Ramón López Laborda

    jlopez@idom.com info.madrid@idom.com

    +34 91 444 11 50

    PUBLICATIONS

    IDOM Transport

    URBAN LIGHT RAIL

    BRAZIL HIGH SPEED

    Prespectivas de Crecimiento de la Movilidad Eléctrica