    840 MW Combined Cycle in 2x2x1 configuration

    CLIENT: GAMA Power Systems Engineering and Contracting, INC. (EPC)

    SERVICES: Basic and Detail Engineering

    YEAR: 2013-2016

    COUNTRY: Turkey

    Multi shaft Combined Cycle Power Plant consisting on a 2x2x1 configuration with two GE model PG9371 (FB) Gas Turbines, 2 HRSGs with 3 pressure levels and one Steam Turbine from GE.
    Cooling system based on ACC. The plant, owned by İÇANADOLU DOĞAL GAZ ELEKTRİK ÜRETİM ve TİCARET A.Ş, is situated on the outskirts of Ankara, near the city of Kirikkale, and is being built by the consortium of GAMA and General Electric. The project is in its final construction phase and the commissioning is expected to be completed in autumn 2016. From that moment, the installation will provide around 2.5% of the electricity needs of the country and about 50 % of electricity consumption in Ankara.
    In early May 2016, the plant went through the First Fire of the gas turbine GT1 and recently in mid-June the “First Fire” of the gas turbine GT2.
    IDOM has completed the detailed engineering of the plant and maintains a presence on site to support GAMA -GE supporting during erection and commissioning .