    IDOM was contracted to perform part of the engineering for the conversion of the PP10 simple cycle with 40 simple cycle gas turbines, into a 10 combined cycle plant with a configuration of 4 gas turbines to 1 steam turbine.This requires the installation of 40 heat recovery steam generators (HRSGs),10 steam turbine generators and 10 air cooled condensers and other auxiliary equipment equipment (water treatment plant, compressed air…)