The project awarded to IDOM comprises two stages and has a total capacity of 36 MW. It is being carried out to ensure compliance with official Mexican regulations and American standards, as well as to meet the requirements of the end client.
IT capacity: 36 MW
The design complies with Uptime Institute Tier III standards and has a total power capacity of 25 MW. It has its own electrical substation and is Carrier Neutral, with a design PUE of 1.5.
IDOM carried out the entire project. The design stages were SD (Schematic Design), DD (Development Design) and CD (Construction Design). The client’s initial project management with CFE (Federal Electricity Commission) supported the energy requests, as well as weekly monitoring of the work. The following components are included:
- Architecture
- Civil Engineering
- Structure
- Electrical
- CCTV, Access Control, Structured Cabling
- Fire protection, Fire alarm
- HVAC
- Hydraulics and Sanitation
- Preliminary Land Studies
- EIS (Environmental Impact Statement)
- Coordination with the Works Project Manager
Coordination with UVIE (Electricity Verification Unit)