CLIENT: ENCE
SERVICES: Permits, Basic Engineering
YEAR: 2010-2012
COUNTRY: Spain
Technical assistance to obtain the necessary permits in order to include in the Preliminary Allocation Register four new electric energy generating plants from biomass feedstocks (forest and/or energy crops) of 20 MWe each. The scope of work included the preliminary engineering, the environmental impact assessment, the Integrated Environmental Authorization, collection and waste projects, drafting of the electricity evacuation line along with the rest of necessary documents and studies to obtain the necessary authorizations.
Renewables Director
Susana Martínez Escriche
sescriche@idom.com
(34) 93 409 22 22
Electric Power