Detail Engineering, Permitting and Construction Management and Supervision on Site
CLIENT: ENEL
SERVICES: Detail Engineering, Permitting and Construction Management
YEAR: 2005
COUNTRY: Spain
In 2005, Italian company ENEL built a Flue Gas Desulphurization plant in Puente Nuevo Power Plant inside a larger Project that included the life extension of the complete plant. The new installations are composed of : – Limestone Mills Building. Necessary to obtain the appropriate granulometry for the process – Desox Process Auxiliary Building. Including five pumps for the slurry movement and all the equipment necessary for the gypsum extraction. – Storage Building. Including all the conveyor belts for the gypsum/limestone transport. Additionally, many actuations were developed to extend the life of the essential equipments of the plant: boiler and steam turbine revamping process, new electrostatic Precipitator, generator, etc. In this project IDOM performed detail engineering activities together with permitting and construction management.
Energy - FOSSIL-FUEL POWER PLANTS - COAL FIRED POWER PLANTS