  • NETWORK MODELLING. GORONA DEL VIENTO HYDRO-WIND POWER PLANT

    CLIENT: Gorona del Viento Hydro-Wind Power Plant

    SERVICES: Network modelling

    COUNTRY: Spain

    Configuration studies and stability analyse done by IDOM for the new Power Plant of Gorona del Viento, contributes to the integration of wind generating and a pumping storage station of more of 10 MW each, in the isolated and weak system of Hierro Island, just with a peak power demand of 5 MW.