CLIENT: Gorona del Viento Hydro-Wind Power Plant
SERVICES: Network modelling
COUNTRY: Spain
Configuration studies and stability analyse done by IDOM for the new Power Plant of Gorona del Viento, contributes to the integration of wind generating and a pumping storage station of more of 10 MW each, in the isolated and weak system of Hierro Island, just with a peak power demand of 5 MW.
Power Transmission Director
Faustino Guillén
faustino.guillen@idom.com
(34) 91 444 11 50
Electric Power