CLIENT: Confidential
SERVICES: Detail Engineering
YEAR: 2014-2016
The power plant, commissioned from the Client will operate using steam obtained by drilling wells to a depth of 3,500 metres. The plant will have an installed capacity of 25 MW and will produce an average of 200 GWh annually, the equivalent to the annual energy consumption of 40,000 people.
The power plant is expected to become operational in late 2016.
Renewables Director
Susana Martínez Escriche
sescriche@idom.com
(34) 93 409 22 22
Electric Power