CLIENT: Vychodoslovenska Vodarenska Spolocnost, VVS
SERVICES: Predesign & Detailed Designs
YEAR: 2004 - 2008
COUNTRY: Slovakia
The Project includes expanding the potable water treatment plant at the foot of the Starina dam, with 53.5 km of major project pipe line and related installations. Integrated supply and sanitation in the area of South Zemplin included more than 250 km of pipelines and 14 waste-water treatment plants. Finally, the documents were prepared for the procurement of the works.
Water Director
Javier Fernández
javier.fernandez@idom.com
Infrastructure Managing Director
Juan Ramón López Laborda
jlopez@idom.com
info.madrid@idom.com
+34 91 444 11 50
Water