Photovoltaic solar power plants in Spain – Other Projects > 250 MWn
Spain
IDOM has participated in the development of photovoltaic solar power plants in Spain, exceeding 250 MWn of installed capacity through various projects and services tailored to client needs. These photovoltaic solar power plants include both ground-mounted and rooftop installations, covering feasibility studies, engineering, technical and financial due diligence, and permitting management, establishing IDOM as a leader in Spain’s photovoltaic sector.
Ground-mounted systems
- Feasibility study (> 6 MWn)
- FV Campas in Seat – Isofoton – 4 MWn
- Sant Guim solar park – Sant Guim de Freixenet Town Hall – 2 MWn
- Basic design for an EPC tender (> 20 MWn)
- Tuin Zonne – Ciudad Real Airport – 20 MWn
- Technical and/or financial due diligence (> 72.7 MWn)
- Spex, Villar del Rey and CRS 2 – Ecoenergías del Guadiana – 33.22 MWn
- Olmedilla de Alcorcón, Herrera and Manzanares – Morgan Stanley – 29.38 MWn
- Carmona – Isofoton – 6 MWn
- Herrera and Manzanares – Morgan Stanley – 4.06 MWn
- Owner’s Engineering (> 65 MWn)
- Malpartida – Versa – 10 MWn
- Extremasol – Fotowatio Renewable Ventures – 10 MWn (permit management and processing was also carried out)
- Llanos de Antolín – Endesa – 5 MWn (permit management and processing was also carried out)
- El Corchito – Sopadel – 25 MWp (basic engineering was also carried out)
- Alconera – Solex – 15 MWn (basic engineering was also carried out)
- Basic and/or detailed engineering (> 82.5 MWn)
- Alcornocalejo – Morgan Stanley – 25 MWn
- Guadarranque – Endesa – 12.3 MWn
- Tinajeros, Alange and Casas de don Pedro – Sunpower – 26.14 MWn
- Almodóvar del Río and El Paso – Gamesa – 11 MWn
- Torremejía – Solex – 8 MWn
Roof-top systems
IDOM has developed the detailed engineering for these types of facilities for projects and diverse clients (FC Barcelona, Spanish RCD, Caesars Casino, Bilbao Exhibition Center, Ochoa Transport, Oviedo Museum of Art, Police Stations, Basque Entity Energy, Bizkaia Technology Park, Vigo Exhibition Center, etc.) with a global power exceeding 2.2 MWn.
CLIENT:
Various
SCOPE:
Basic Engineering
Basic Engineering
Detailed Engineering
Feasibility Studies
Owner's Engineering
Technical/Financial Due Diligence