CLIENT: Zonguldak Municipality
SERVICES: Detailed Design
YEAR: 2013
COUNTRY: Turkey
The Project consists of the improvement and expansion of the existing drainage network, which has more than 42 km of sewage systems, creating 25 km more of new construction. Included in the network are 7 pump stations and a collector – interceptor to pump wastewater to the wastewater treatment plant, as well as an outfall, 620 m in length, to get rid of waste from the treatment plant.
Water Director
Javier Fernández
javier.fernandez@idom.com
Infrastructure Managing Director
Juan Ramón López Laborda
jlopez@idom.com
info.madrid@idom.com
+34 91 444 11 50
Water