Biomass plants of 15-16 MWe
Spain
Basic engineering for two biomass plants in Miajadas (Cáceres) and Briviesca (Burgos) of 15 and 16 MWe respectively.
The scope of work included the conceptual and basic engineering:
- Mass and Energy Balance
- P&IDs
- Overall single line diagram
- layout and the technical specification for the construction under an EPC contract)