CLIENT: Taranto's City Council (Comune di Taranto)
SERVICES: Technical-economic feasibility project and Basic Design (Progetto di Fattibilità Tecnico-Economica (PFTE) and Progetto Definitivo (PD)
YEAR: 2020-2021
COUNTRY: Italy
IDOM is carrying out the Technical-Economic Feasibility Project and the Basic Design for the “Bus Rapid Transit” lines in the City of Taranto. With a very high frequency service, this electric transport system runs on segregated lanes, with the aim of increasing the speed of traditional road transport and achieving a performance similar to that […]
IDOM is carrying out the Technical-Economic Feasibility Project and the Basic Design for the “Bus Rapid Transit” lines in the City of Taranto. With a very high frequency service, this electric transport system runs on segregated lanes, with the aim of increasing the speed of traditional road transport and achieving a performance similar to that of a classic metro.
The BRT network project, included in the Urban Plan for Sustainable Mobility (Piano Urbano della Mobilità Sostenibile – PUMS), is being developed following a multi-criteria process (considering cost, execution time, technologies, sustainability, etc.) in close coordination with the municipal administration of Taranto.
The BRT, the largest and most innovative in Italy and among the most important in Europe will impact strongly on the socio-economic development of the city and the province, and the sustainable transformation of the transport sector. It has two main components:
The projects are being carried out in collaboration with two companies of renowned Italian national prestige: Tecnosistem SpA and Associazione Professionale Specialisti Puglia.
Urban Light Transport Director
Iban Mirones Truan
iban.mirones@idom.com
Infrastructure Managing Director
Juan Ramón López Laborda
jlopez@idom.com
info.madrid@idom.com
+34 91 444 11 50
URBAN LIGHT TRANSPORT SYSTEMS
IDOM Transport
BRAZIL HIGH SPEED
Public Works Magazine – Gudauri Tunnel