Unsaturated polyester resin production plant
Spain
Cray Valley’s unsaturated polyester resin production plant in Miranda de Ebro, Spain, is being expanded with the installation of a new production line, reinforcing its industry leadership. The project includes the construction of a new seven-story production building, the modernization and expansion of storage and pumping facilities, and the upgrade of auxiliary and control systems, enhancing the operational efficiency and capacity of the plant.
The project includes the construction of a new production building consisting of ground floor + 6 floors above ground level, the expansion of the storage park (remodeling 4 existing tanks and building 2 new tanks and 3 pumping stations, as well as a new double bay for tank truck loading and a holding tank), and the expansion and adaptation of the plant’s auxiliary facilities (cooling water, 3Mfrig/h; thermal oil, 3Mkcal/h, high and low voltage electricity, 1,000 kVA; new distributed control system, including the integration and migration of the existing one for the rest of the lines; adaptation of the existing compressed air, nitrogen and steam networks for the integration of the new production line with the rest).
IDOM has carried out the basic process engineering, complete detailed engineering, procurement and construction management, permit processing and work supervision.
CLIENT:
Cray Valley-Total
SCOPE:
Basic Engineering
Construction Management
Detailed Engineering
Procurement Management
Technical Assistance - Works
Works supervision