The Electrical system modernization Gaviota platform Bizkaia project, executed by IDOM, involved a comprehensive upgrade of the electrical system at ENAGAS’s underground gas storage terminal in Bizkaia. This Electrical system modernization Gaviota platform Bizkaia encompassed the renewal of the 30 kV main substation, 6 kV and 0.4 kV switchgears, and the automation integration via DCS, ensuring operational efficiency and reliability for the facility in Bizkaia.
The system consists of a 30-kV main substation, a 6-kV switch and a 0.4 kV main switch, including automation from the DCS.
The scope of services provided by IDOM included the following:
- On-site review of the baseline data
- Basic engineering
- Integration of the power control system
- Detailed Engineering
- Technical assistance during the procurement phase
- Technical assistance during FAT tests
- Construction supervision
- Technical assistance during commissioning
CLIENT:
ENAGAS
SCOPE:
Detailed Engineering
Technical Assistance during Commissioning
Technical Assistance during construction